PERMOHONAN METER TNB – LULUS DULU BARU BAYAR - KONTRAKTOR ELEKTRIK BERDAFTAR - 0139214322

HOW TO CLOSE A TNB ACCOUNT NAME

TNB METER APPLICATION – APPROVAL FIRST, PAYMENT LATER

To close a TNB account, you need to submit a request to TNB, settle any outstanding bills, and TNB will perform a final meter reading. If there is a remaining deposit, it will be refunded to you after deducting the final bill.

Below are the steps:

Apply for Account Closure:
Submit a request to close your TNB account. You can do this at a TNB counter, online, or via the TNB mobile application (if available).

Settle Outstanding Bills:
Ensure that all outstanding TNB bills are fully paid.

Final Meter Reading:
TNB will conduct a final meter reading on the requested termination date.

Deposit Refund:
If you have a deposit, TNB will refund the remaining balance (after deducting the final bill) to the bank account you have registered.

Submit Documents:
You may need to prepare documents such as the original deposit receipt, a copy of your identity card, and the account closure application form.

Account Closure Form:
You may be required to fill in an account closure form, which can be obtained from TNB.

If you want to close a TNB account, this process is usually called “Termination of Supply” or “Closing of Account”.
There are 3 easy ways:

1.Via MyTNB Portal

Log in to the MyTNB Portal.
Select the account you want to close.
Click “Request” → “Terminate Supply”.
Fill in details such as the termination date & bank account number (for deposit refund).
Submit the request.

2. Using the MyTNB Mobile App or https://www.mytnb.com.my/

Log in to the MyTNB app.
Go to the “Request” or “Services” menu.
Select “Terminate Account”.
Complete the details and submit.

3. Visit a TNB Kedai Tenaga

Bring the following documents:

  • IC (account holder)

  • Latest electricity bill

  • Copy of bank account details (for deposit refund)

💡 Important Notes:

  • The deposit will be refunded after the final meter reading is completed and the final bill is settled.

  • The process usually takes 7–14 working days.

  • If a house or office will be registered under a new owner, the existing account must be closed first by the current account holder.

Providing Services

TNB Electricity Meter Applications for new and existing houses / projects / housing developments / shops

  • TNB Electricity Meter Applications for 1 Phase and 3 Phase

  • TNB Meter Name Change

  • TNB Electricity Meter Upgrade Applications

  • Temporary electricity supply applications

  • TNB meter upgrade works

  • Wiring and troubleshooting

Verification of construction approvals / Signing and stamping of electrical approvals for CF / G7

SERVING THE ENTIRE PENINSULAR MALAYSIA
APPROVAL FIRST, PAYMENT LATER | TRUSTED CONTRACTOR | BUMIPUTERA CONTRACTOR

THE CHOICE OF HOMEOWNERS, WIREMEN, BUILDING CONTRACTORS, AND DEVELOPERS

NO. 1 TNB METER APPLICATION CONTRACTOR IN MALAYSIA

For any enquiries, quotations, or suggestions, please contact:
Please call/WhatsApp: 013 921 4322
www.wasap.my/60139214322

We are a TNB-registered Electrical Contractor, registered with the Energy Commission (ST) and CIDB, offering TNB Meter Application services.


Experienced in handling TNB meter applications for houses, shops, factories, government premises, quarters, telco substations, farms, housing developments, projects, and offices.

Please WhatsApp us for enquiries regarding TNB meter installation.

For verification of registered contractors

Search: https://myaccount.mytnb.com.my/search/searchstcontractors

woman wearing yellow long-sleeved dress under white clouds and blue sky during daytime

Excellent service, the TNB electricity meter application process was very fast.

Ali Rahman

Four utility meters mounted on a brick wall, connected by a series of pipes and fittings. The scene is dimly lit, casting shadows on the wall and the meters.
Four utility meters mounted on a brick wall, connected by a series of pipes and fittings. The scene is dimly lit, casting shadows on the wall and the meters.

Very satisfied with Bani Venture’s service. All TNB electricity meter applications were fully handled by Bani Venture.

Siti Aisyah

An analog utility meter is mounted on the exterior wall of a building. In front of the meter, there is a lush green shrub with broad leaves. The wall is covered with white siding, creating a clean and orderly background.
An analog utility meter is mounted on the exterior wall of a building. In front of the meter, there is a lush green shrub with broad leaves. The wall is covered with white siding, creating a clean and orderly background.
★★★★★
★★★★★