  1. When can you apply for electricity?

    A house must be at least 80% completed, with wiring completed, and the DB and meter board installed according to the required specifications and accessories.

  1. How long does the electricity application process take until supply is available?

    For new applications, it usually takes 1–14 working days. In some areas, installation can be completed within 1–3 days, depending on location and workforce availability.

    For meter-only applications (excluding service cable works), it typically takes 1–3 days.

    If poles are required, the process will usually take longer.

  1. How is the electricity application process?

    If it is a new house or a house that has been vacant for more than 5 years, the application must go through a contractor.
    If not, you may apply online or walk in directly to TNB.

    Click here – How to Apply for a TNB Meter Online.

  1. If the house previously had a meter but it was removed by the previous tenant/owner, how do you get the meter back?

    If it is a new house or the house has been vacant for more than 5 years, the application must go through a contractor.
    If not, you may apply online or walk in directly to TNB.

    Click here – How to Apply for a TNB Meter Online.

  1. What is required to apply for a TNB meter?

    The house must be at least 80% completed, with wiring completed, and the DB and meter board installed according to the required specifications and accessories.

  1. How do you apply for a meter if the land owner has passed away?

    You will need to provide the land title, death certificate, and a letter of residence (which can be obtained from the Village Head).

TNB METER BOARD HEIGHT ACCORDING TO TNB SPECIFICATIONS

KETINGGIAN PAPAN METER TNB MENGIKUT SPEC YANG DITETAPKAN TNB
KETINGGIAN PAPAN METER TNB MENGIKUT SPEC YANG DITETAPKAN TNB
KETINGGIAN PAPAN METER TNB MENGIKUT SPEC YANG DITETAPKAN TNB
KETINGGIAN PAPAN METER TNB MENGIKUT SPEC YANG DITETAPKAN TNB
KETINGGIAN PAPAN METER TNB MENGIKUT SPEC YANG DITETAPKAN TNB
KETINGGIAN PAPAN METER TNB MENGIKUT SPEC YANG DITETAPKAN TNB
  1. How much is the fee to apply for a TNB electricity meter?

    The cost of applying for a TNB electricity meter depends on the type of house, type of application, whether it is 1-phase or 3-phase, and the type of connection (overhead or underground).
    All prices vary accordingly and can be referred to in the relevant price table.

  1. What is the procedure to get a TNB meter?

    Submit → Approved → Pay → Completed

  1. Can you apply for two TNB meters for one house?

    No. TNB does not allow two meters for a single house.
    There must be a separate entrance/door to apply for a new meter.
    If it is under the same roof, it is still acceptable as long as there are separate units/entrances.

  1. I want to apply for new meters for a house with more than 2 units (rental house or housing project). Is it possible?

    Yes, it is possible. For applications involving more than 2 units, you are required to submit a Group Application. The pricing is the same as a new application, but the process is usually slightly slower.

    A Group Supply application is a collective application. If a property has more than one unit, a group application is required—such as multi-unit rental houses, housing projects, or residential estates. The price is the same as a new application, but the cost may be broken down per unit. This helps TNB with planning work such as cable sizing, cable routing, and pole placement.

  1. How is the process to upgrade a meter from Single Phase to 3 Phase?
  • Upgrade the DB from Single Phase to 3 Phase (including related wiring and meter board, according to TNB specifications).

  • Appoint a registered Electrical Contractor under the Energy Commission (ST) to submit the TNB meter upgrade application.

  • BANI VENTURE can manage the entire process from A to Z.

  1. I bought a house from a developer. How do I get the electricity meter installed?

    For housing development units, you should first check with the developer. This is because the connection charges have usually already been paid by the developer, and you only need to pay the deposit to activate the meter.

    Housing project files are normally handled and kept by the developer, so there is no need to pay the connection charges twice, as that would be unnecessary.

    You only need to pay the deposit for meter installation.

    You may also deal with Bani Venture to assist with the process.

  1. I want to apply for a TNB meter under my name, but the land title is under someone else’s name. Is it possible?

    Yes, it is possible.

    You will need to provide the land owner’s IC and a letter of authorization/consent, if available.
    If you apply through Bani Venture, we can provide a sample authorization letter.

    Alternatively, you may submit a Sale & Purchase Agreement or Tenancy Agreement, which must be stamped by LHDN.

  1. Can I apply for electricity supply even if the house is not fully completed? Can I apply for the meter early?

    The house must be at least 80% completed, with wiring completed, and the DB and meter board installed according to the required specifications and accessories.

    If the electricity is needed for construction purposes, you must apply for a temporary meter. .

  1. Who will install the meter, the contractor or TNB?

    TNB will install the meter.
    The contractor only manages and handles the application process.

  1. Can I apply for a TNB electricity meter directly with TNB without using a contractor?

    If it is a new house or a house that has been vacant for more than 5 years, the application must go through a contractor.
    If not, you may apply online under an existing application or walk in directly to TNB.

SOALAN LAZIM APPLY METER TNB

  1. Is a land title required to install an electricity meter?

    Yes, it is very important. TNB will review every application document before approving it. You may submit a land title / agreement / S&P / letter from the government, or any document that can be used as proof of ownership.

    If you do not have these documents, you may WhatsApp or call us:
    www.wasap.my/60139214322

  1. How can you know if the contractor has submitted the meter application?

    If the contractor has submitted the application using the applicant’s email, TNB will send an email notification to the applicant.
    If no email is received, it means no notification has been sent by TNB.

  1. If the meter is not installed within the stated period, what should be done?

    You should refer back to the contractor or call the TNB Careline at 1300-88-5454 to check the status and make a report.

    Usually, delays may occur due to issues such as no pole stock, unsuitable weather conditions, rectification works required, low-voltage areas, and various other technical reasons.

  1. Is the billing rate the same for 1-phase and 3-phase?

    For domestic (residential) customers, the TNB billing rate is the same for 1-phase and 3-phase.

    For business / commercial premises, the billing rates are different from residential tariffs.

  1. Are TNB meter charges the same throughout Malaysia?

    TNB charges in Peninsular Malaysia are the same nationwide.
    However, Sabah and Sarawak have different charges.

    The differences mainly depend on:

    • Type of premises

    • 1-phase or 3-phase supply

    • Type of connection (overhead or underground)

  1. What if the meter application is unsuccessful?

    TNB will do its best to provide electricity supply to everyone. However, if the area is classified as a low-voltage area, it cannot be avoided until the area is upgraded or improved.

    Don’t worry — you can get a full refund from TNB.
    If you applied through BANI VENTURE, we will refund 100% of the contractor charges.

  1. Why apply for a TNB meter with BANI VENTURE?

    Bani Venture is the No. 1 choice among landowners, contractors, wiremen, and developers.

    No worries — our terms are pay after approval.
    No booking deposit required
    TNB charges can be paid directly to TNB, either at TNB counters or via online banking, without going through Bani Venture

    Bani Venture is committed to providing the best service with fast response.

    To date, Bani Venture has successfully handled more than 5,000 Express applications and over 1,000 Group Supply projects throughout Peninsular Malaysia.
    You may contact us for examples of applications in your area.

SERVICE
APPLY FOR TNB METER

TNB METER APPLICATION – APPROVAL FIRST, PAYMENT LATER – REGISTERED ELECTRICAL CONTRACTOR

METER EXISTING

Electricity Meter Application for Houses and Shops that Previously Had a Meter (Existing)

Electricity Meter Application for New Houses and Shops (Newly Built)

Application to upgrade or downgrade your TNB electricity meter.

NEW METER
UPGRADE / DOWNGRADE
TEMPORARY SUPPLY METER
CLOSED ACCOUNT
CHANGE NAME
GROUP SUPPLY
HOW TO APPLY FOR A METER ONLINE (MYTNB)
DOCUMENTS FOR METER APPLICATION
TNB METER FREQUENTLY ASKED QUESTIONS
TYPES OF TNB METERS AND LATEST TNB SPECIFICATIONS
NEM METER

TNB Account Closure Application / Closed TNB Account Application

Application for temporary electricity supply to meet your needs..

Change TNB Account Name for New Owner or Tenant

Group Application for Rental Houses / Housing Estates and Residential Areas

Applying for an electricity supply is now easier with MyTNB.

List of documents required to be submitted for a TNB Meter application.

Installation method, installation height of TNB meters, and types of TNB meters.

Answering questions and enquiries regarding TNB meters.

Net Energy Metering (NEM) Scheme Meter Application

woman wearing yellow long-sleeved dress under white clouds and blue sky during daytime

Excellent service, the TNB electricity meter application process was very fast.

Ali Rahman

Four utility meters mounted on a brick wall, connected by a series of pipes and fittings. The scene is dimly lit, casting shadows on the wall and the meters.
Four utility meters mounted on a brick wall, connected by a series of pipes and fittings. The scene is dimly lit, casting shadows on the wall and the meters.

Very satisfied with Bani Venture’s service — all TNB electricity meter applications were fully handled by Bani Venture.

Siti Aisyah

An analog utility meter is mounted on the exterior wall of a building. In front of the meter, there is a lush green shrub with broad leaves. The wall is covered with white siding, creating a clean and orderly background.
An analog utility meter is mounted on the exterior wall of a building. In front of the meter, there is a lush green shrub with broad leaves. The wall is covered with white siding, creating a clean and orderly background.
★★★★★
★★★★★