APPLY FOR TNB METER – TEMPORARY SUPPLY
TNB METER APPLICATION – APPROVAL FIRST, PAYMENT LATER
APPLY FOR TNB METER – TEMPORARY SUPPLY
Make sure your application is under the correct category. A Temporary Supply meter is treated the same as a New Meter / Newly Built application, for premises that have never had a meter or do not have any TNB cable. If the premises previously had a meter, you must apply under Existing / Existing Meter.
A Temporary Supply meter application is mandatory to be processed through a contractor. This means only a contractor can submit the application, and it cannot be done by the applicant individually.
To apply for a Temporary Supply with TNB, it is usually used for construction projects, temporary events, night market sites, or short-term works that require electricity.
The process is similar to a normal meter application, but the category is Temporary Electricity Supply.
💡 Important Tips:
Ensure you use a TNB-registered electrical contractor (Competent Person) – you may directly contact Bani Venture.
The application process usually takes 5–21 working days, depending on location and supply readiness.
Temporary supply has a limited duration (e.g. 3 months, 6 months, or one year) and can be extended if required.
Meter charges fall under the shop / commercial category.
Temporary meter specifications are different from permanent meter applications, and specifications are set according to TNB requirements for each area. Most temporary meter boards must be installed on a pole or underground, and proper electrical installation works are mandatory.
A temporary meter is not allowed to be converted into a permanent meter. The temporary meter must be terminated, and a new permanent meter application must be submitted.
Steps to Apply for TNB Temporary Supply
1. Site & Document Preparation and Submission
The site must be ready for meter application, with completed wiring, meter board, and related works.
Prepare all documents required by TNB.
2. TNB Evaluation Process
TNB will review the documents and site location.
If complete, TNB will issue a quotation (connection charges + deposit).
The deposit is higher than a normal meter due to the short-term usage.Payment of the deposit and charges must be made before connection works begin.
3. Temporary Meter Installation
The electrical contractor will install the temporary pole/meter setup.
TNB will connect the supply after the installation passes inspection.
4. Termination
After the project or event ends, the applicant must inform TNB to terminate the temporary supply.
The deposit will be refunded after the final bill is settled.
For new applications, there are 2 cost components that you need to pay
Payment to TNB
i. Deposit / Security deposit
ii. Consumer Connection Charge (CSP)
iii. Stamp duty
(you may refer to the TNB price table that I have prepared according to house type)Contractor management charges
TNB METER PAYMENT RATES – NEW APPLICATION
TNB payment rates can be referred to in the table below. Payments to TNB can be made directly to TNB without going through the contractor. Only the contractor’s charges need to be paid directly to the contractor after approval. Our company is a registered electrical contractor under the Energy Commission (ST), CIDB, and TNB.
Note: The prices below are for new premises that have never had a meter. Contractor management charges are not included.
The consumer connection charge for underground supply is RM 1,700, and the rate is the same for 1 phase and 3 phase.


In conclusion, you need to plan carefully. In my opinion, if you are applying for a supply for a house with a short construction period, you should also consider whether it is worth it or not.
Example: for SPNB houses, applying for a temporary meter is not worthwhile.
Getting the meter can sometimes take up to a month.
A temporary meter cannot be converted into a permanent meter; it must be terminated and a new permanent meter applied for.
The construction period for SPNB houses is not long.
There is a lot of non-recoverable cost — a temporary meter standby can be around RM2,000, with monthly charges that are higher because it is under commercial rates.
A better suggestion is to use a generator for construction work or use electricity from a nearby neighbour, if possible.
TNB Meter Application Process
Site Visit – Document Handover – Submit – Approved – Payment – Installation – COMPLETED
The process for a new meter application depends on the type of application.
ESTIMATED – Temporary Supply Meter Application. The application must be submitted under estimated, where a TNB officer is required to visit the site first before approval is granted to the applicant. The processing time may be longer than an express application.
The Consumer Connection Charge (CSP) must be paid to TNB after the application is approved. The charges imposed depend on the scope of installation, whether it is an overhead line (from pole to meter board) or an underground line. For overhead lines, the pole cost is free, and no additional pole charges are imposed by TNB. Applications for overhead and underground cables are priced differently.
Domestic / Residential
1 Phase
New – RM 450 (Overhead)
RM 1,700 (Underground)Domestic 3 Phase
New and upgrade – RM 750 (Overhead)
RM 1,700 (Underground)Commercial 1 Phase
New – RM 450
Commercial 3 Phase
New and upgrade – RM 1,700
The meter security deposit must also be paid to TNB after the electricity connection is completed by TNB. The deposit amount depends on the type of premises, whether it uses a 1-phase or 3-phase meter. For commercial premises, the deposit depends on the maximum demand requirement. The deposit is refundable if the user closes the account.
Stamp duty RM10 — this usually indicates that the stamped document falls under a fixed-rate category (not based on cash value such as a property sale and purchase).
Documents required to apply for a TNB meter under an INDIVIDUAL name
Proposed Address:
Phone No:
Email:
Location:
Applicant’s IC (marking for TNB / for TNB use)
Land document / land title / official search / S&P / agreement / assessment tax / any document that can be used as proof of ownership
Nearest neighbour’s electricity bill
Documents can be submitted in PDF or image format, as long as they are clear.
If you know a TNB staff member, you may provide the staff ID to obtain a free deposit.
Documents required to apply for a TNB meter under a COMPANY / BUSINESS name
Proposed Address:
Phone No:
Email:
Location:
Representative’s IC (marking for TNB / for TNB use)
Land document / land title / official search / S&P / agreement / assessment tax / any document that can be used as proof of ownership
Nearest neighbour’s electricity bill
SSM documents and Business Registration Certificate under the Registration of Businesses Act 1956 (Form D) and the Latest Business Profile Search issued by SSM, or Application for Registration of a Company (Section 14) and Notice of Registration (Section 15); or Company (Form 9);
or Certificate of Incorporation on Change of Company Name (Form 13) and Managing Director / Company Directors (Form 49); or certificate of registration for associations, cooperatives, or law firms
Documents can be submitted in PDF or image format, as long as they are clear.
If you know a TNB staff member, you may provide the staff ID to obtain a free deposit.






Providing Services
TNB Electricity Meter Applications for new and existing houses / projects / housing developments / shops
TNB Electricity Meter Applications for 1 Phase and 3 Phase
TNB Meter Name Change
TNB Electricity Meter Upgrade Applications
Temporary electricity supply applications
TNB meter upgrade works
Wiring and troubleshooting
Verification of construction approvals / Signing and stamping of electrical approvals for CF / G7
SERVING THE ENTIRE PENINSULAR MALAYSIA
APPROVAL FIRST, PAYMENT LATER | TRUSTED CONTRACTOR | BUMIPUTERA CONTRACTOR
THE CHOICE OF HOMEOWNERS, WIREMEN, BUILDING CONTRACTORS, AND DEVELOPERS
NO. 1 TNB METER APPLICATION CONTRACTOR IN MALAYSIA
For any enquiries, quotations, or suggestions, please contact:
Please call/WhatsApp: 013 921 4322
www.wasap.my/60139214322
We are a TNB-registered Electrical Contractor, registered with the Energy Commission (ST) and CIDB, offering TNB Meter Application services.
Experienced in handling TNB meter applications for houses, shops, factories, government premises, quarters, telco substations, farms, housing developments, projects, and offices.
Please WhatsApp us for enquiries regarding TNB meter installation.


For verification of registered contractors
Search: https://myaccount.mytnb.com.my/search/searchstcontractors