METER APPLICATION REQUIREMENTS

  1. Before submitting an application, the house/premises must be fully completed or at least 90% completed and safe. Do not apply for a permanent meter if construction has not yet started. For construction purposes, a temporary meter application is required.

  2. Must comply with TNB meter installation specifications, with completed wiring, DB, and meter board installed according to TNB-specified standards.

  3. Must not be located in a low-voltage area. In some areas, TNB may be unable to provide supply due to insufficient available capacity.

  4. Must have planning approval / local council licence / assessment tax for commercial applications in certain areas.

Make sure your application is under the correct category.
Group Supply Application / Group Electricity Supply Application is a new application for premises that have never had a meter or do not have any TNB cable. If the premises previously had a meter, you must apply under Existing / Existing Meter Application.

A Group Supply / Group Electricity Supply Application is mandatory to be processed through a contractor or developer. This means only a contractor can submit the application, and it cannot be done by the applicant individually.

For Group Supply new applications, there are 2 cost components that you need to pay

  • Payment to TNB
    i. Deposit / Security deposit
    ii. Consumer Connection Charge (CSP)
    iii. Stamp duty
    (you may refer to the TNB price table that I have prepared according to house type)

  • Contractor management charges

TNB Group Supply Meter Application Process
  • Appoint a TNB-registered electrical contractor (Registered Electrical Contractor – REC)

  • The contractor will submit the application through the myTNB for Contractors system under the “Group Application” category

  • TNB will review the documents and technical requirements

  • TNB will issue a quotation for connection costs (infrastructure + deposit for each account)

  • The applicant / developer makes the payment

  • Installation of infrastructure (poles, cables, substation if required)

  • Installation of meters for each unit/location

  • Electricity supply is activated / Enjoy your power supply safely

Group Application – The application must be submitted under estimated, where a TNB officer is required to visit the site first before approval is granted to the applicant. The processing time may be longer than an express application.

Meter Installation Duration for Group Applications

  • Depends on the project scale and infrastructure requirements.

  • Minimum 4–8 weeks for small projects.

  • Large projects involving a new substation may take 3–6 months.

This also depends on the location. Sometimes it is faster, sometimes slower, depending on demand.

  • The Consumer Connection Charge (CSP) must be paid to TNB after the application is approved. The charges imposed depend on the scope of installation, whether it is an overhead line (from pole to meter board) or an underground line. For overhead lines, the pole cost is free and no additional pole charges are imposed by TNB. Applications for overhead and underground cables are priced differently.

  • Domestic / Residential

    1 Phase

    New – RM 450 (Overhead)
    RM 1,700 (Underground)

  • Domestic 3 Phase

    New and upgrade – RM 750 (Overhead)
    RM 1,700 (Underground)

  • Commercial 1 Phase

    New – RM 450

  • Commercial 3 Phase

    New and upgrade – RM 1,700

  • The meter security deposit must also be paid to TNB after the electricity connection is completed by TNB. The deposit amount depends on the type of premises, whether it uses a 1-phase or 3-phase meter. For commercial premises, the deposit depends on the maximum demand requirement. The deposit is refundable if the user closes the account.

  • Stamp duty RM10 — this usually indicates that the stamped document falls under a fixed-rate category (not based on cash value such as a property sale and purchase).

TNB METER PAYMENT RATES – GROUP APPLICATION

TNB payment rates can be referred to in the table below. Payments to TNB can be made directly to TNB without going through the contractor. Only the contractor’s charges need to be paid directly to the contractor after approval. Our company is a registered electrical contractor under the Energy Commission (ST), CIDB, and TNB.

Note: The prices below are for new premises that have never had a meter. Contractor management charges are not included.

The consumer connection charge for underground supply is RM 1,700, and the rate is the same for 1 phase and 3 phase.

Additional Pole Charges for TNB Applications
At present, poles are provided free of charge, even if multiple poles are required, as long as they are necessary for the meter application. The poles are the property of TNB, not individuals. TNB reserves the right to install poles if required, and not to install them if they are not necessary.

Group Meter Application Charges

EXAMPLE: Kampung House – 1 Phase

  • Stamp Duty: RM 10

  • CSP: RM 450

  • Deposit: RM 170

  • RM 630 per unit

Pricing and payment process

Submit → TNB site visit → TNB issues quotation → payment → installation of cable/poles → cable installation completed → we submit again for meter and account name → TNB installs meter → power supply activated, enjoy electricity

After cable approval by TNB, payment:
RM 450 × 6 = RM 2,700
Total RM 2,700 👈

After cable works are completed, meter application payment:
RM 180 × 6 = RM 1,080

COMPLETED

Therefore, the total price depends on the type of house and the number of supply phases required, as well as the distance and complexity of the application.

Contact me for more information on pricing:
013 921 4322 (BANI VENTURE)
www.wasap.my/60139214322

Documents required to apply for a TNB meter under an INDIVIDUAL name

  • Proposed Address:

  • Phone No:

  • Email:

  • Location:

  • Applicant’s IC (marking for TNB / for TNB use)

  • Land document / land title / official search / S&P / agreement / assessment tax / any document that can be used as proof of ownership

  • Nearest neighbour’s electricity bill

  • Documents can be submitted in PDF or image format, as long as they are clear.

  • If you know a TNB staff member, you may provide the staff ID to obtain a free deposit.

Documents required to apply for a TNB meter under a COMPANY / BUSINESS name

  • Proposed Address:

  • Phone No:

  • Email:

  • Location:

  • Representative’s IC (marking for TNB / for TNB use)

  • Land document / land title / official search / S&P / agreement / assessment tax / any document that can be used as proof of ownership

  • Nearest neighbour’s electricity bill

  • Company registration documents such as:

  • SSM Registration Certificate / Business Profile

    Registration of Businesses Act 1956 (Form D), or

    Application for Registration of a Company (Section 14) and Notice of Registration (Section 15), or

    Company (Form 9), or

    Certificate of Incorporation on Change of Company Name (Form 13) and Directors / Managing Director details (Form 49), or

    Certificate of registration for associations, cooperatives, or law firms

  • Documents can be submitted in PDF or image format, as long as they are clear.

  • If you know a TNB staff member, you may provide the staff ID to obtain a free deposit.

APPLY FOR TNB METER
TNB Meter Applications are divided into two categories:

  • Domestic (residential

  • Commercial (business)

When the term “TNB group application” is mentioned, in TNB terminology it usually refers to a Group Electricity Supply Application (Group Supply Application). TNB has stipulated that if more than one unit is involved, a group application must be submitted.

This type of application is used when multiple units / lots / houses apply for an electricity supply connection within the same project or area.

Examples:

  • A housing developer applying for electricity supply for all houses at once

  • A landowner of kampung lots applying for supply for several houses under one layout plan

  • A commercial site with multiple shop lots

As commonly known, the process may take slightly longer, because a group application is not the same as a single-unit (express) application. Group applications are processed collectively, such as for housing estates or residential developments. This allows TNB to better plan cable sizing, pole layout, and supply capacity.

Procedure for Applying TNB Group Electricity Supply (Group Supply)

💡Tips

  • For small projects (e.g. 3–5 kampung houses), the connection cost is shared among all applicants.

  • For large housing projects, the infrastructure cost is usually borne by the developer.

  • It is best to ensure all documents are complete from the beginning to avoid delays.

SUMMARY OF HOW TO APPLY FOR A TNB METER – NEW APPLICATION / NEWLY BUILT (GROUP SUPPLY)


1.Group meter applications must be processed through a contractor or developer.
2.Payment is required for deposit + connection charges + stamp duty + contractor charges, according to the type of premises as determined by TNB.

3.The premises must be completed or at least 80% completed.

4.The installation period ranges from 4 weeks to 6 months.

5.It is mandatory to deal with a contractor and submit all required documents to the contractor.

Providing Services

TNB Electricity Meter Applications for new and existing houses / projects / housing developments / shops

  • TNB Electricity Meter Applications for 1 Phase and 3 Phase

  • TNB Meter Name Change

  • TNB Electricity Meter Upgrade Applications

  • Temporary electricity supply applications

  • TNB meter upgrade works

  • Wiring and troubleshooting

Verification of construction approvals / Signing and stamping of electrical approvals for CF / G7

SERVING THE ENTIRE PENINSULAR MALAYSIA
APPROVAL FIRST, PAYMENT LATER | TRUSTED CONTRACTOR | BUMIPUTERA CONTRACTOR

THE CHOICE OF HOMEOWNERS, WIREMEN, BUILDING CONTRACTORS, AND DEVELOPERS

NO. 1 TNB METER APPLICATION CONTRACTOR IN MALAYSIA

For any enquiries, quotations, or suggestions, please contact:
Please call/WhatsApp: 013 921 4322
www.wasap.my/60139214322

We are a TNB-registered Electrical Contractor, registered with the Energy Commission (ST) and CIDB, offering TNB Meter Application services.


Experienced in handling TNB meter applications for houses, shops, factories, government premises, quarters, telco substations, farms, housing developments, projects, and offices.

Please WhatsApp us for enquiries regarding TNB meter installation.

For verification of registered contractors

Search: https://myaccount.mytnb.com.my/search/searchstcontractors

woman wearing yellow long-sleeved dress under white clouds and blue sky during daytime

Perkhidmatan yang sangat baik, proses permohonan meter elektrik TNB sangat cepat.

Ali Rahman

Four utility meters mounted on a brick wall, connected by a series of pipes and fittings. The scene is dimly lit, casting shadows on the wall and the meters.
Four utility meters mounted on a brick wall, connected by a series of pipes and fittings. The scene is dimly lit, casting shadows on the wall and the meters.

Sangat berpuas hati dengan servis bani venture, semua permohonan meter elektrik TNB bani venture uruskan.

Siti Aisyah

An analog utility meter is mounted on the exterior wall of a building. In front of the meter, there is a lush green shrub with broad leaves. The wall is covered with white siding, creating a clean and orderly background.
An analog utility meter is mounted on the exterior wall of a building. In front of the meter, there is a lush green shrub with broad leaves. The wall is covered with white siding, creating a clean and orderly background.
★★★★★
★★★★★