PERMOHONAN METER TNB – LULUS DULU BARU BAYAR - KONTRAKTOR ELEKTRIK BERDAFTAR - 0139214322

Mohon Meter TNB | COVER AREA

APPLY | MOHON METER | KUALA LUMPUR
APPLY | MOHON METER | SELANGOR
APPLY | MOHON METER | NEGERI SEMBILAN
APPLY | MOHON METER | MELAKA
APPLY | MOHON METER | PERAK
APPLY | MOHON METER | KEDAH
APPLY | MOHON METER | JOHOR
APPLY | MOHON METER | PULAU PINANG
APPLY | MOHON METER | PERLIS
APPLY | MOHON METER | KELANTAN
APPLY | MOHON METER | TERENGGANU
APPLY | MOHON METER | PAHANG

APPLY MOHON METER TNB

PERMOHONAN METER TNB – LULUS DULU BARU BAYAR - KONTRAKTOR ELEKTRIK BERDAFTAR

Electricity Meter Application for Houses and Shops that Previously Had a Meter (Existing)

Electricity Meter Application for New Houses and Shops (Newly Built)

Application to upgrade or downgrade your TNB electricity meter.

CHANGE NAME

TNB Account Closure Application / Closed TNB Account Application

Application for temporary electricity supply to meet your needs..

Change TNB Account Name for New Owner or Tenant

Group Application for Rental Houses / Housing Estates and Residential Areas

Applying for an electricity supply is now easier with MyTNB.

List of documents required to be submitted for a TNB Meter application.

Installation method, installation height of TNB meters, and types of TNB meters.

Answering questions and enquiries regarding TNB meters.

Net Energy Metering (NEM) Scheme Meter Application

HOW TO APPLY FOR A TNB ELECTRICITY METER & COSTS (2025)

TNB METER APPLICATION – APPROVAL FIRST, PAYMENT AFTER – REGISTERED ELECTRICAL CONTRACTOR

APPLY FOR TNB METER
TNB Meter Applications are divided
into two categories:

  • Domestic (residential)

  • Commercial (business)

TNB Meter Supply is divided into two types:
1 PHASE (230V)
3 PHASE (400V)

Description of TNB Meter Application Types

You need to understand first. There are many categories for meter applications, so make sure your application is submitted under the correct category.

  1. For existing meter applications, this refers to premises that still have the black TNB cable and previously had a meter installed. For this type of application, CSP payment is not required, and it does not need to go through a contractor if the house has not been left vacant for more than 5 years. You may follow this method –

  1. New meter applications for houses or premises are mandatory and must be processed through a contractor. Connection charges are required, along with a deposit and stamp duty. Contractor charges will also apply if contractor services are used.

  1. You are advised to upgrade from single-phase supply to three-phase supply when your household electrical load exceeds 10 kW or 50 A. Generally, if you have three (3) or more air conditioners in your home, you should upgrade to a 3-phase supply as it improves the stability and reliability of the electricity supply.

  1. An application for construction purposes or for premises that are not permanent in nature. It is commonly used for the construction of a project.

  1. An application to close a TNB account is usually made when the homeowner or tenant no longer uses the house/premises, relocates, or sells the property. You will receive a refund of the TNB meter deposit that was previously deposited into the TNB account.

  1. An application to change the TNB meter name is usually made when someone rents or purchases a new house/premises where the meter is still active but registered under a previous owner or tenant. The meter must be transferred to the new name. The meter itself does not need to be changed and can continue to be used as usual; however, in the system, the account name will be updated with no outstanding arrears. Any existing arrears will remain under the previous account holder. For payment, you are required to pay a TNB meter deposit, as the previous deposit will be refunded to the former account holder.

  1. A Group Supply application is a bulk application. If there is more than one housing unit, a group supply application is required, such as rental houses with multiple units and housing estates / residential areas. The pricing is the same as a new application, but it will be broken down by unit. This helps TNB with planning work such as cable sizing, cable routing, and pole positioning.

  1. The Net Energy Metering (NEM) and P2P meter applications mentioned above are channels for generating income by selling excess energy to TNB, so you do not need to install expensive storage batteries. Once the meter installation work is completed, an application is made to convert the meter to a solar meter that can export and import electricity and sell the generated energy to TNB.

woman wearing yellow long-sleeved dress under white clouds and blue sky during daytime

Excellent service, the TNB electricity meter application process was very fast.

Ali Rahman

Four utility meters mounted on a brick wall, connected by a series of pipes and fittings. The scene is dimly lit, casting shadows on the wall and the meters.
Four utility meters mounted on a brick wall, connected by a series of pipes and fittings. The scene is dimly lit, casting shadows on the wall and the meters.

Very satisfied with Bani Venture’s service — all TNB electricity meter applications were fully handled by Bani Venture.

Siti Aisyah

An analog utility meter is mounted on the exterior wall of a building. In front of the meter, there is a lush green shrub with broad leaves. The wall is covered with white siding, creating a clean and orderly background.
An analog utility meter is mounted on the exterior wall of a building. In front of the meter, there is a lush green shrub with broad leaves. The wall is covered with white siding, creating a clean and orderly background.
★★★★★
★★★★★